Omix-Ada Steel Replacement Hood 93-98 Jeep Grand Cherokee

  • Model: Omix-Ada 12037.01 Hood
  • Shipping Cost: 175.95 shipping
  • 1Dropships direct from manufacturer
  • Manufactured by: AmeriHood

$459.95

Please Choose:

Country




Add to Cart:

Description:

Omix-Ada is a Suwanee, Georgia based-company that strives to improve the off-roading experience for you and your Jeep. The owner of Omix-Ada is a Jeep enthusiast whose life-long passion eventually led to a company that has been developing the best for Jeeps for the past two decades.

Widespread appraise has landed Omix-Ada in the top step of the Jeep aftermarket world. Due to their consistently high-quality products built with heritage in mind, Omix-Ada has been given the rights to use "MOPAR Authentic Restoration" and "MOPAR Official Licensed Product" logos for the more than 30 licensed parts they produce. With a lifetime of experience, relatively-small company size, and insatiable thirst for quality and improvement, buying Omix-Ada is a sure bet.

Note: Sanded, primed or altered parts are non-returnable. All hoods ship truck freight. Hoods can only be shipped to a business address or freight terminal. Period. Not deliverable to a residential address. Freight charges are non-refundable.

AVAILABILITY: Made to Order: Usually ships in 2-3 Weeks

Note: For safety purposes hood pins are required for ALL aftermarket hoods.

Upon receiving the hood please be sure to inspect the item for "freight damage". If there are signs of freight damage you must refuse the item, then contact us immediately.

Once we verify the freight damage with the carrier a replacement item will be shipped. This process usually takes about 5-10 business days.

It is the customer's responsibility to inspect the item.

The two most common signs of freight damage are holes punctured by a fork lift or it's being dropped by the driver causing the corner to bend.

We will not be held liable for any damages after the delivery receipt is signed off.


This product was added to our catalog on Tuesday 07 August, 2018.

Copyright © 2024 3rd Strike Performance
Website Designed by: Manor Media Group